Planning and Regs
Planning permission, permitted development, building regulations and party wall rules.


Do You Need Planning Permission for Decking? The 30cm Rule Explained
Most garden decking doesn't need planning permission, but a deck over 30cm high, or one covering over half the garden, does. The rules explained plainly.


Do You Need Planning Permission for a Garden Room? The Rules Explained
Most garden rooms don't need planning permission if they meet the permitted development limits on height, position and use. Here are the rules.


Bathroom Zones Explained: What Can Go Where in a UK Bathroom
Bathroom zones set where lights, fans and electrics can go. Zones 0, 1 and 2 explained, the IP ratings each needs, sockets, RCDs and who can do the work.


RSJ Beam: What It Is, When You Need One and How It Goes In
An RSJ is the steel beam that carries the load when a structural wall comes out. When you need one, who sizes it and how it's installed safely.


Party Wall Agreement: What It Is, When You Need One and How It Works
A party wall agreement is needed when building work affects a shared wall or digs near a neighbour's foundations. Notices, timings and surveyors explained.


Do You Need Planning Permission for a Driveway?
Most new driveways need no planning permission if they are permeable or drain onto your own land. The 5m² front garden rule and when it applies.


Replacing a Conservatory With an Extension: What It Really Involves
Replacing a conservatory with an extension often needs no planning permission. What it costs, why old foundations rarely work, and how the build runs.


Do I Need a Structural Engineer for My Extension?
Most extensions need a structural engineer. When building control requires one, what they actually do, what they cost, and when you can do without.


How Deep Do Foundations Need to Be for a Single Storey Extension?
Most single storey extension foundations go down at least 1 metre, and 1 to 1.5 metres is typical. Building control can ask for more on shrinkable clay, near trees or drains, or to match the existing house, so the final depth is confirmed once the trench is open. We build single storey extensions in Kettering and across Northamptonshire, and foundation depth is the biggest source of cost variation on a quote. Below we cover how the depth is set, what pushes it deeper, and wha


Front of House Extension: What's Allowed and What It Costs
You can build an extension on the front of your house, but it almost always needs full planning permission. Permitted development rights do not cover extensions beyond the principal elevation of a house, which is the wall facing the road. The only common exception is a small porch, which can be built under permitted development if it stays within strict size limits. A front extension can still be the more useful build: a cramped hallway, no porch, no downstairs cloakroom and


Home Extension Drawings Explained: Plans, Elevations, Sections
What goes in a home extension drawing pack: existing and proposed plans, elevations, sections, site plans, building regs details and double storey extras.


How Long Does Planning Permission Take for an Extension? The Real Timeline
Planning permission for a house extension takes 8 weeks from validation. The real timeline, prior approval, LDCs and what pushes decisions past 8 weeks.


Can You Build an Extension Over a Drain Cover? What's Allowed and What Isn't
Yes, you can usually build an extension over a drain, but you can't build directly over the cover itself, and the rules around it depend on who owns the drain. Drains come up on most projects we quote, from Kettering to home extensions in Northampton, so below is what is allowed, what isn't and what to do when a cover sits where you want the new wall. Can you build an extension over a drain cover? No, you can't build an extension directly over a drain cover or manhole. The co


Do You Need Planning Permission for a Loft Conversion?
Most loft conversions in England don't need planning permission if they stay within permitted development. The limits, the exceptions and building regs.