A resin bound driveway in the UK typically costs between £50 and £120 per square metre fully installed, including VAT. The low end is a resin layer laid over an existing base that is already sound. The high end is a full dig-out with a new sub-base, a new permeable binder course and new edging. For a typical 50 square metre front drive, that puts most projects somewhere between £2,500 and £6,000.
Those are typical UK market ranges, not a fixed price. Every drive is priced on its own ground, size and access, which is why a site visit matters more than a per-metre figure.
What drives the cost of a resin driveway
The resin layer itself is only part of the price. Most of the variation comes from what happens underneath it.
The base. An overlay on sound tarmac or concrete is the cheapest route. A new base means excavating, removing spoil, laying and compacting a sub-base and adding a binder course. That work often costs as much as the resin.
Area. Larger drives cost less per square metre because set-up, mixing and labour spread across more ground. Small paths and drives often carry a minimum charge.
Edging and borders. Block or kerb edging holds the edges and stops them breaking up. A contrast border adds material and labour.
Drainage. Falls, channel drains and soakaways add cost, but a front drive over 5 square metres must drain properly to avoid needing planning permission.
Aggregate and resin. Premium stone blends and UV-stable (aliphatic) resin cost more than standard mixes and aromatic resin, but the UV-stable resin is what stops the surface yellowing.
Access and removal. Tight access, skips and removing an old concrete drive all add to the total.
Resin driveway cost by size
Using the typical £50 to £120 per square metre range, here is roughly how common drive sizes work out. The lower figure assumes an overlay on a sound base, the upper a full new base.

Single car, around 20 square metres: about £1,000 to £2,400, though small drives often attract a minimum charge that pushes the lower figure up.
One to two cars, around 35 square metres: about £1,750 to £4,200.
Two cars, around 50 square metres: about £2,500 to £6,000.
Larger drive, around 80 square metres: about £4,000 to £9,600, with the per-metre rate usually falling as the area grows.
To work out your own area, measure the length and width of each rectangle of the drive in metres, multiply them, and add the pieces together. Leave out lawn or border that will stay as it is.
Running costs after it is laid
Resin bound is one of the cheaper surfaces to look after. There are no joints to re-sand and weeds cannot root through a properly laid surface. Expect to sweep it, remove leaves before they stain, and give it a low-pressure wash once or twice a year. Oil spots are best treated quickly. Budget for a professional deep clean every few years if you want it to look new.
Overlay vs new base
An overlay is only worth it when the existing surface is solid, level, crack-free and drains. Resin is a thin wearing layer, so it copies every flaw beneath it. Laying over cracked concrete or tired tarmac usually means the cracks come back through within a year or two.
A new base costs more up front but gives the surface the life it is capable of. If you are comparing two quotes and one is far cheaper, check whether it is an overlay. The difference in price is often the difference in base, and the base is what decides how hard wearing resin driveways are over the years.
At Heritage we price driveways in Kettering and across Northamptonshire after seeing the ground, because the base is the one part of the job you cannot see on a photo.
How resin compares with other driveway surfaces
Typical UK installed ranges per square metre, including VAT:

Gravel: roughly £40 to £70. The cheapest surface, but it needs edging, topping up and a stabilising grid on slopes.
Tarmac: roughly £45 to £90. Hard-wearing and quick to lay, but not permeable unless porous asphalt is used.
Block paving: roughly £80 to £130. Easy to repair and traditional in look, with joints to maintain.
Resin bound: roughly £50 to £120. Smooth, permeable over the right base, and low maintenance.
Imprinted concrete: broadly similar to block paving, depending on pattern and colour.
Driveway cost in the UK depends far more on groundworks than on the finish, so two very different surfaces can end up close in price once the dig-out and drainage are included.
What a good quote should include
A resin driveway quote you can compare properly should state:
Whether the price is an overlay or a new base, and what the new base is made of.
The depth of sub-base and the thickness of the resin layer (15 to 18mm is typical for driveways).
The resin type (UV-stable aliphatic or aromatic) and the aggregate blend.
Edging, borders and any drainage channels or soakaways.
Removal and disposal of the old surface.
Any dropped kerb or highway work, which is a separate council process with its own fees.
Any guarantee, and what it covers.
If a quote leaves the base out, ask. It is the question that explains most of the gap between the cheapest and dearest prices.
Ways to keep the cost down
Keep a sound existing base if it genuinely is sound, and get it checked rather than assumed.
Choose a simple shape. Curves and cut-outs add labour.
Use a standard aggregate blend rather than a premium one.
Combine jobs. Doing the drive and the patio at the same time shares set-up and skip costs, which is why we often quote patios in Kettering alongside a new drive.
Resin driveway cost: questions, answered
Is resin cheaper than block paving?
Per square metre the ranges overlap. An overlay on a good base is usually cheaper than new block paving. On a full new build with a fresh base, the two often land close together.
Does a resin driveway need planning permission?
Not usually, if it is permeable or drains onto your own lawn or border. A front drive over 5 square metres that is neither needs planning permission, as our guide to driveway planning permission explains. A dropped kerb always needs council approval.
How long does it take to lay?
The resin itself usually goes down in a day. A full job with dig-out, new base and edging is typically a few days, depending on size and weather, as resin cannot be laid in rain.
Getting a price for your drive
The per-metre figures above are a sensible starting point for budgeting, but the ground decides the real number. If you would like a proper, itemised price, whether you are in Kettering or need one of our driveways in Oundle, our team can survey the base, the falls and the drainage and tell you whether an overlay is realistic or a new base is needed, so get in touch when you are ready to book a visit.